Skip to content Skip to footer

How to keep the enthusiasm till the end of the project

All solutions that are used by the project stakeholders to manage their work, now need to provide data in formats that can provide the golden thread of data, which is critical to achieving constraint free work and to the success of AWP. As detailed in the recent CII Document-AWP Data Requirements Implementation Guideline

Oracle, as CII members and veterans of schedule and data management, fully understand the concepts and methodology of AWP and as a data-driven organization, recognize the value of creating a golden thread of data across an asset lifecycle.

As such, Oracle Construction and Engineering has looked at this problem and with their Primavera P6 Enterprise Project Portfolio Management and Primavera Unifier platform, established a configuration that can be adopted by any organization that is looking to follow the three steps to achieving the benefits of AWP for their organization.

Primavera Unifier is a comprehensive enterprise data driven solution, which not only integrates to key solutions such as engineering authoring, SCM and ERP, but reduces the use of other disparate spreadsheet and ad-hoc data offerings that create significant data challenges.

The Primavera Unifier AWP configuration

Oracle Construction and Engineering has developed a pre-configured AWP-packaged solution using Primavera Unifier, a solution known for flexibility and easy integration with other systems. The solution enables organizations to address the AWP data challenge and to integrate that data with both engineering and procurement solutions.

In addition, this offering would enable owner organizations to quickly and easily use AWP to oversee their delivery organizations, improving both productivity and safety, while decreasing total installed cost.

This AWP solution could be adopted to manage any work packaged approach to project delivery, whether following the AWP process or an internal methodology.

In addition, we have brought together both the Advanced Work Packaging approach and Progress Measurement based on Rules of Credit, to provide a comprehensive offering for organizations looking to build on or mature their use of AWP and that require a data driven technology to support this goal.

Learn more about CII best practices.

Leave a comment